Modular Industrial Buildings

Petrochemical, Mining, & Remote Housing

Palomar Modular Buildings produces prefabricated industrial buildings for companies that include commercial construction, energy production, mining, engineering and remote workforce housing. Our accelerated construction and delivery methods are well-suited for:

  • Commercial Construction Industry
  • Petrochemical Industry
  • Mining Industry
  • Engineering Industry
  • Remote Housing Industry

industrial buildings constructionPalomar’s modular building systems may be assembled to meet any need. Our modular methodology has a proven track record for strength and is capable of withstanding hurricane force winds  including our:

  • Office and Administrative Buildings: High quality office space for placement at or in any facility.
  • Zone II Buildings: Building system for placement at the Zone I/II Boundary as defined in API RP 753.  This building will provide a safe working environment (can withstand 1.0 psi pressure wave) and increase productivity due to its proximity within the plant.
  • Man Camp Facilities: Complexes suited for remote area use/placement to reduce transportation time and lodging expenses, including: sleeping quarters, offices, dining facilities, kitchens, restrooms, shower facilities, training buildings, recreation buildings, worship facilities and medical facilities.

Get A Free Estimate

Tell us what you need and we will give you a Free, no obligation estimate

The Benefits of Modular Industrial Buildings

Cost Efficient

Modular building projects are up to 20% less expensive than stick built buildings 1

Modular Construction

80%

Stick Built Construction

100%

Quick Delivery

Modular building projects are constructed up to 50% faster than stick built buildings 1

Modular Construction

50%

Stick Built Construction

100%

Under Budget

65% of A/E/C professionals using Modular Construction report that project budgets are decreased. 41% report that project budgets are decreased by 6% or more. 1

Reduce Project Schedule

66% of A/E/C professionals using Modular Construction report that project schedules are decreased. 35% report that project schedules are decreased by 4 weeks or more. 1

The Benefits of Faster Construction Completion

How does faster construction completion affect your bottom line? Let’s look at how the difference in completion times affects a 40,000 square foot $7.7 million dollar apartment development. If we use conventional construction as a baseline, we can see how using modular construction to complete the project 25% or 50% percent faster will reduce construction interest costs and increase the rental income opportunity significantly.

If Project is Completed 25% Faster

Title

25%

By reducing the project schedule by 25% the project will save $5,214 in construction interest and can earn $293,333 extra rental income.

5214
Saved Construction Interest
293333
Earned Additional Rental Income

If Project is Completed 50% Faster

Title

50%

By reducing the project schedule by 50% the project will save $78,147 in construction interest and can earn $440,000 extra rental income.

78147
Saved Construction Interest
440000
Earned Additional Rental Income

The Modular Building Construction Process in Three Easy Steps

palomar modular buildings manufacturing fabrication
palomar modular buildings transportation
palomar modular buildings installation construction

Fabrication

Palomar’s manufacturing facility benefits from years of continuous process improvement and work flow assembly planning. The controlled production environment and material staging system produces a high level of fabrication precision and reduces construction waste.

Transportation

The fabricated modules are shipped by carriers that specialize in modular building transportation. For large projects, like a man camp, that consist of dozens of modules the delivery is staged in phases so the modules can be prepared and installed in a logical sequence.

Installation

A general contractor, often one specializing in modular construction, will install the modules. Finish out can include electrical and mechanical system connection between modules, stairs, wheelchair ramps, skirting, exterior siding, trim and utility connections.