Storage Building Construction

Palomar Modular Buildings provides modular self storage buildings manufactured to meet our client’s precise specifications. We provide cost-effective storage building design, development and project management. Our advanced modular construction team provides cutting-edge services at an unprecedented pace to bring new self-storage facilities online quickly so the spaces can begin being rented out as quickly as possible.

storage building constructionPalomar’s modular building process produces self-storage buildings up to 20% less expensive, and up to 50% faster than conventional construction. In fact, our modular building strategy makes it possible to complete up to 90% of the building construction off-site which results in reduced site disruption, faster project completion time and quicker client occupancy.

From floor to ceiling, interior to exterior we give our clients a range of material and finish selections for them to create the atmosphere they are looking to achieve.

  • A variety of optimized floor plans
  • Multiple interior and exterior finish options
  • Energy efficient and green building options

Get A Free Estimate

Tell us what you need and we will give you a Free, no obligation estimate

The Benefits of Modular Storage Buildings

Cost Efficient

Modular building projects are up to 20% less expensive than stick built buildings 1

Modular Construction

80%

Stick Built Construction

100%

Quick Delivery

Modular building projects are constructed up to 50% faster than stick built buildings 1

Modular Construction

50%

Stick Built Construction

100%

Under Budget

65% of A/E/C professionals using Modular Construction report that project budgets are decreased. 41% report that project budgets are decreased by 6% or more. 1

Reduce Project Schedule

66% of A/E/C professionals using Modular Construction report that project schedules are decreased. 35% report that project schedules are decreased by 4 weeks or more. 1

The Benefits of Faster Construction Completion

How does faster construction completion affect your bottom line? Let’s look at how the difference in completion times affects a 40,000 square foot $7.7 million dollar apartment development. If we use conventional construction as a baseline, we can see how using modular construction to complete the project 25% or 50% percent faster will reduce construction interest costs and increase the rental income opportunity significantly.

If Project is Completed 25% Faster

Title

25%

By reducing the project schedule by 25% the project will save $5,214 in construction interest and can earn $293,333 extra rental income.

5214
Saved Construction Interest
293333
Earned Additional Rental Income

If Project is Completed 50% Faster

Title

50%

By reducing the project schedule by 50% the project will save $78,147 in construction interest and can earn $440,000 extra rental income.

78147
Saved Construction Interest
440000
Earned Additional Rental Income

The Modular Building Construction Process in Three Easy Steps

palomar modular buildings manufacturing fabrication
palomar modular buildings transportation
palomar modular buildings installation construction

Fabrication

Palomar’s manufacturing facility benefits from years of continuous process improvement and work flow assembly planning. The controlled production environment and material staging system produces a high level of fabrication precision and reduces construction waste.

Transportation

The fabricated modules are shipped by carriers that specialize in modular building transportation. For large projects, like a man camp, that consist of dozens of modules the delivery is staged in phases so the modules can be prepared and installed in a logical sequence.

Installation

A general contractor, often one specializing in modular construction, will install the modules. Finish out can include electrical and mechanical system connection between modules, stairs, wheelchair ramps, skirting, exterior siding, trim and utility connections.